- Yarloop Workshops

The Fitting Shop

Leaving the Boilermakers’ Shop by turning to the right brings the visitor into the realm of the fitters, turners and mechanical engineers. Large double gates provided access to the main building. On entering, a set of steps appeared on the left, leading to a walkway up in the roof area beside the main drive shaft. All around this roof area were pulleys and drive belts and, in the latter years, a massive electrical motor that drove the whole of the works. This replaced the steam engine that was in the Engine Room below and, like that engine, it was connected to all the machinery in the Workshops by the belts hanging from the drive shafts in that massive roof space. To activate each machine the operator put tension on the belts and their machine sprang into action.

The first of these machines was a bright yellow Dean, Smith and Grace metal lathe. This was not original but was typical of the most sophisticated lathes built in the early 20th century. Other lathes, some of which were original, were placed all along the opposite wall below the windows. Turners needed the best light available, electric light came later. The lathes were of different sizes but the two that attracted the most attention were the massive 22-foot-long lathes, simple in their design but able to turn out exceptionally long lengths of steel tubing. In between, stacked on cone like stands, were the gears that could be inserted to give the metal turner the speed they needed for their particular jobs.

Towards the middle of the building was a variety of other machines for working steel. A large radial arm drill and slotting machines stood higher than their operators. In those days the multi-functional milling machines of today were not available so each machine, with its skilled operator, performed their own unique job. Having written this though, I remembered the bolt-making machine in the Blacksmiths’ Shop, that formed the head of the bolt and cut it to size before transferring the bolt to the threading machine next to it.

Next to the machines was the railway line. Geoff Fortune, who grew up in Yarloop and seems to have spent considerable time in the Workshops as a boy, writes that the whole of the approximately 50 metres of track would be continuously crowded with jobs on the go. Railway engines would be stripped down and fitted with new boilers, wheels and anything else that needed replacing. Machines, like planing machines, needed by the many mills that were serviced from the Yarloop Workshops, would be repaired or even made from scratch in this Shop. One of the stories is about an enormous steam-driven whim, designed to move the great logs through the bush. This machine was entirely built in the Workshops. A photo of all this action can be seen below on the Fitting Shop notice board.

Nothing seems to have been impossible for the machines and their operators to build or fix. With other machine suppliers and repairers many weeks or even months away, the timber industry had to be self-sufficient. The 130 skilled tradesmen that the Millar Brothers brought out from the UK in the early 1900s were an asset to the Company and the State.[1]

The entrance to the Main Workshop

The Fitting Shop. Photo courtesy Shire of Harvey Pre-Fire photos.

The steps at the entrance of the Fitting Shop leading to the machinery above.
A belt to a grinder can be seen in the foreground. Photo, courtesy Shire of Harvey Pre-Fire photos.

Health and Safety notice with an ominous warning. Note the sleeper flooring that was standard for the entire building. Photo courtesy Leanne Ward.

Imagine the entire length covered in jobs and workers. Photo courtesy Leanne Ward.

The Machines. The radial-arm saw and a slotting machine are in the middle foreground
with lathes on the sides. Photo courtesy Shirley Brokenshire.

…………………………………………………………….

[1] From ‘The Phoenix Rises Very Slowly’ Part 39, March 2025, by Allan Ward, Hon. Curator.